Delay Analysis in Construction Contracts
Delay Analysis in Construction Contracts - P. John Keane Nedostupné

Kniha ( pevná vazba )

    • Produkt je nedostupný.
E-shopové listy

Při zaslání zboží balíčkem

K nákupu nad 99 Kč dárek zdarma v hodnotě 19 Kč

E-shopové listy

Let na měsíc

Při zaslání zboží balíčkem

K nákupu nad 999 Kč dárek zdarma v hodnotě 299 Kč

Let na měsíc

The most significant unanticipated costs on many construction projects are the financial impacts associated with delay and disruption to the works. Assessing these, and establishing a causal link from each delay event to its effect, contractual liability and the damages experienced as a direct result of each event, can be difficult and complex… Přejít na celý popis

K tomuto produktu zákazníci kupují

Popis

The most significant unanticipated costs on many construction projects are the financial impacts associated with delay and disruption to the works. Assessing these, and establishing a causal link from each delay event to its effect, contractual liability and the damages experienced as a direct result of each event, can be difficult and complex. This book is a practical guide to the process of delay analysis and includes an in-depth review of the primary methods of delay analysis, together with the assumptions that underlie the precise calculations required in any quantitative delay analysis. The techniques discussed can be used on projects of any size, under all forms of construction contract, both domestic and international. The authors discuss not only delay analysis techniques, but also their appropriateness under given circumstances, demonstrating how combined approaches may be applied where necessary. They also consider problematic issues including ‘who owns the float’, concurrent delay, early completion programmes, and disruption. The book has been brought fully up to date, including references to the latest publications from the CIOB, AACEI and SCL, as well as current case law. Broad in scope, the book discusses the different delay analysis approaches likely to be encountered on national and international projects, and features practical worked examples and case studies demonstrating the techniques commonly used by experienced practitioners. This is an invaluable resource to programmers and schedulers, delay analysts, contractors, architects, engineers and surveyors. It will also be of interest to clients’ professional advisors managing extension of time or delay claims, as well as construction lawyers who require a better understanding of the underlying assumptions on which many quantitative delay analyses are based. Reviews of First Edition"John Keane and Anthony Caletka are pukka analysts in that tricky area of delays, programming and extension of time. I highly recommend their book Delay Analysis in Construction Contracts. Buy the book." (Building Magazine, February 2009)"The book's stated purpose is to provide a practical guide for those interested in schedule delay analysis. It provides a good in–depth review of the most common delay analysis techniques.... An excellent book, full of practical tips for the reader and very timely in its publication. It is well worth the cost and a good read for anyone involved in schedule delay analysis." (Cost Engineering, February 2009)It achieves in spades its stated aim of being a practical guide for contractors, contract administrators, programmers and delay analysts, as well as construction lawyers who require a better understanding of the underlying assumptions on which many quantitative delay analyses are based. (Construction Law Journal, 2009)

Sdílet

Nakladatel
John Wiley and Sons Ltd
Rozměr
252 x 179 x 19
jazyk
angličtina
Vazba
pevná vazba
Hmotnost
636 g
isbn
978-1-118-63117-1
Počet stran
288
datum vydání
12.06.2015
ean
9781118631171

Hodnocení a recenze čtenářů Nápověda

0.0 z 5 0 hodnocení čtenářů

5 hvězdiček 4 hvězdičky 3 hvězdičky 2 hvězdičky 1 hvezdička

Přidejte své hodnocení knihy

Vývoj ceny

Vývoj ceny Nápověda

Získejte přehled o vývoji ceny za posledních 60 dní.

Maloobchodní cena Minimální prodejní cena: 0 Kč Nápověda

Články, které stojí za pozornost

Zobrazit blog

Články, které stojí za pozornost